Featured Projects - Lock & Dam #2, Monongahela River

Back to Featured Projects

The Challenge


Successfully defend our client, a foundation sub-contractor, at arbitration on a 1.5 million dollar delay/extended support claim from the general contractor.

The GCS Solution


A GCS principal was assigned to the arbitration. Working with legal counsel, GCS performed an independent analysis of the schedule delay and the general contractors extended cost claim. GCS prepared counter arguments with supporting exhibits that clearly illustrated the historical facts in support of our client.

The Result


GCS was an effective part of the defense team that successfully defended our client. As an expert witness at the arbitration, GCS conclusively demonstrated to the arbitrators that the general contractor's claim was without merit.