The Challenge
As a sub consultant for The Downtown Design Partnership
(DDP), a Joint Venture of DMJM Harris, Inc. and STV Incorporated,
in association with Santiago Calatrava, GCS had to meet
a "fast track" schedule to prepare independent cost estimates
for approximately $500 million of construction for the new PATH
Terminal Station at the World Trade Center.
The GCS Solution
Rapidly integrated our experienced estimators with the DDP
team. Provided independent estimates on multiple bid packages.
Reviewed estimates with personnel from the Downtown Design
Partnership and the Port Authority.
The Result
The DDP utilized the input provided by GCS for construction
budget and design adjustments. The revised information was
provided to members of the design team and the Port Authority.
|
|