Primavera P-6 Scheduling

Back to Services

G.C. Solutions, Inc. (GCS) has "real life" field knowledge and technical understanding to complete all aspects of construction project scheduling. GCS can fulfill the needs of a client, whether it is preparing a basic over-view bar-chart schedule or preparing a detailed Primavera P-6 schedule for a Contractor or an Owner. GCS also offers a range of additional technical scheduling support services.

Primavera P-6 Scheduling for Heavy Civil Projects

  • Prepare basic and detailed Primavera P-6 schedules for contractors and owners
  • Alternate P-6 project sequencing for time savings
  • Clear concise Work Breakdown Structures (WBS) for ease of use
  • Activity breakdown and durations that correspond to the estimated productions
  • Develop accelerated schedules for contractor and owner benefits
  • Review of existing Primavera P-6 schedules for realistic and accurate durations, work sequences and milestone dates



Contract Time Determinations (CTD) for an Owner using Primavera P-6

  • Prepare basic and detailed Primavera P-6 schedules for contractors and owners
  • Prepare a CTD using Primavera P-6 for Owner determination of Milestone dates
  • Primavera P-6 CTD activity durations based on the estimate
  • Comparison P-6 CTD's to provide an owner with option for accelerated work plans



Schedule Analysis

  • Prepare basic and detailed Primavera P-6 schedules for contractors and owners
  • Prepare an independent analysis and narrative of the logic for an existing schedule
  • Forensic schedule analysis to determine impacts relative to work changes or claims
  • Critical activity micro-schedules to determine activity durations and sequencing by the hour for work performed during road closures and track outages
  • Prepare schedule comparisons to illustrate advantages and disadvantages of working a standard 40 hour week versus multiple shifts